View Single Post
Old 04-29-2014, 11:14 PM   #269 (permalink)
user removed
Master EcoModder
 
Join Date: Sep 2009
Posts: 5,927
Thanks: 877
Thanked 2,024 Times in 1,304 Posts
Drilled all but 6 of the tabs, floors are completely installed except for paint, sealing and final installation. Next welding session will be the seat mounts and some more tabs for final assembly of the side panels. I painted the upper portion of the frame with a brush and rustoleum, will do the bottom before sealing and final floor panel installation.

regards
Mech





Attached Thumbnails
Click image for larger version

Name:	002.JPG
Views:	508
Size:	62.1 KB
ID:	14941   Click image for larger version

Name:	005.JPG
Views:	505
Size:	72.5 KB
ID:	14942   Click image for larger version

Name:	007.JPG
Views:	504
Size:	77.9 KB
ID:	14943  
  Reply With Quote
The Following 4 Users Say Thank You to user removed For This Useful Post:
aerohead (04-30-2014), Christ (05-20-2014), HHOTDI (05-04-2015), Xist (04-30-2014)