View Single Post
Old 12-07-2014, 10:46 PM   #63 (permalink)
stovie
EcoModding Apprentice
 
Join Date: Oct 2010
Location: Ivins UT
Posts: 213

the green machine :P - '97 Jeep Grand Cherokee ZJ
90 day: 20.92 mpg (US)

Thee s10 - '00 Chevy S10
90 day: 24.27 mpg (US)

Freedom - '05 Kawasaki Ninja 250EX
90 day: 75.55 mpg (US)
Thanks: 2
Thanked 24 Times in 22 Posts
ok guys here's some pics of the reaction chamber im working on. It took me a while to get everything figured out on how to get them small enough for download here but i got it.

Click image for larger version

Name:	Reaction-Chamber.jpg
Views:	33
Size:	83.7 KB
ID:	16568

This is the first part of the reaction chamber. The white thats on it is actually clear caulk that starts white then dries clear so as you can see it's still not dry. I got in a bit of a hurry and pulled the spacers out to soon so some of the plates have pushed together so ill have to see about fixing that later.

Click image for larger version

Name:	Reaction-Chamber2.jpg
Views:	31
Size:	78.5 KB
ID:	16569

on this end i decided to let it dry first before removing the spacers. after their both dry i'll caulk them together and it will be one full piece.

the first on is about three inches and the second is about two and a quarter inches wide with about 70-80 plates. more info after they dry!!
  Reply With Quote
The Following User Says Thank You to stovie For This Useful Post:
wmjinman (12-07-2014)