View Single Post
Old 02-27-2015, 05:15 PM   #7 (permalink)
EVmetro
EcoModding Apprentice
 
Join Date: Feb 2015
Location: Sacramento
Posts: 202
Thanks: 3
Thanked 225 Times in 91 Posts
The last detail for the engine bay is a throttle. This is just 1/8" aluminum plate cut to fit on the strut tower, and then a Chinese pot box, PB6 style is screwed onto my custom aluminum. I got set up with polishing stuff over at Harbor Freight, so I am enjoying polishing the aluminum work on this rig. This uses the factory throttle cable.



So, the engine compartment is set up, so now the body needs rework.



The body is pretty hammered, dents all over every surface.



so I fixed all that kind of stuff.



Had to tear it down pretty good



Primer



Paint





  Reply With Quote
The Following 3 Users Say Thank You to EVmetro For This Useful Post:
bespurcell (01-12-2016), mikeyjd (03-19-2015), Xist (02-27-2015)