View Single Post
Old 12-15-2015, 04:26 PM   #39 (permalink)
aardvarcus
Master EcoModder
 
aardvarcus's Avatar
 
Join Date: Apr 2012
Location: Evensville, TN
Posts: 676

Deep Blue - '94 GMC Suburban K2500 SLE
90 day: 23.75 mpg (US)

Griffin (T4R) - '99 Toyota 4Runner SR5
90 day: 25.43 mpg (US)
Thanks: 237
Thanked 580 Times in 322 Posts
Extruded polystyrene and concrete, now you are speaking my language. I don't know what (if anything) you were thinking for the side walls, but 4" blocks dry stacked on the edges of your pit with surface bonding cement on the inside faces for strength would give a nice finished wall to your pit without too much effort.
  Reply With Quote
The Following User Says Thank You to aardvarcus For This Useful Post:
aerohead (12-16-2015)