Quote:
Originally Posted by freebeard
That makes more sense than digging it out so you have to stand up all the time.
You'll need a smooth floor for the creeper. Are you going to pour walls or use cinder block, or ???
|
Once the bottom pad is placed,I'll tie in the vertical steel reinforcement, make a reinforced plywood form for the inner face of the walls,up level to the top of the upper slab elevation and pour all that as a monolith.
Then I'll have the elevation established for the rest of the flat work.
I'm gonna go ahead and run some conduit and at least a double-gang electrical box into one wall for power tools and lighting.
And a sump pit at one corner in case a Tsunami hits.