View Single Post
Old 10-18-2017, 10:33 PM   #1 (permalink)
me and my metro
Master EcoModder
 
me and my metro's Avatar
 
Join Date: Jun 2008
Location: Oregon
Posts: 556

Economy Saturn - '02 Saturn L200
Thanks: 255
Thanked 198 Times in 156 Posts
New twist to my day job

Hybrid PTO boom operation idle mitigation with cab comfort system. The company I work for is purchasing Hybrid bucket trucks for electric powerline maintenance. Our regular trucks require the Diesel engine to run at an elevated idle to power the boom to lift the lineman and equipment to the pole tops. There is technology out there to to power our boom requirements by battery power packs. We have some early versions that run on lead acid 48 volt systems. I went to a two day training session on the newer 4KW lithium ion 12/24 volt systems. Very impressive and I am looking forward to next years new trucks. Here are a couple pics of the power unit.




Attached Thumbnails
Click image for larger version

Name:	B2695DF3-F1B0-49F0-83F8-23E5871016BD.jpg
Views:	161
Size:	77.2 KB
ID:	22856   Click image for larger version

Name:	BF099199-97AA-4109-BACF-5365A23381D1.jpg
Views:	167
Size:	78.4 KB
ID:	22857  
__________________
02 Saturn L200 5 speed- 265k miles
84 Gmc 6.5 na diesel K30 4x4, TMU
2006 Lincoln Navigator, 215k miles
  Reply With Quote