The 8mw wind turbine blades may not be able to be transported to some remote areas.
There may not be enough cranes to put up 8+Mw turbines faster than 2mw.
I'm assuming that the bigger crane when loaded has lower wind tolerance too so fewer build days will be available.
|
One presumption would be that issues like these would be addressed in the most early planning stages of a project.