View Single Post
Old 02-25-2019, 07:20 AM   #5118 (permalink)
RedDevil
Master EcoWalker
 
RedDevil's Avatar
 
Join Date: Dec 2012
Location: Nieuwegein, the Netherlands
Posts: 3,999

Red Devil - '11 Honda Insight Elegance
Team Honda
90 day: 54.23 mpg (US)
Thanks: 1,714
Thanked 2,247 Times in 1,455 Posts
A big grid battery won't do the laundy either. It won't brush your teeth. It won't wipe your *.
It will just do what it was designed to do.

There's no such thing as a 50 GW power station.
https://en.wikipedia.org/wiki/List_o...power_stations

A power plant would cost about $900 - $5,000 per kW to build, depending on the energy source. https://www.eia.gov/electricity/generatorcosts/
Those (2016) numbers are outdated though, Tesla's 100 MW battery would cost 176.3 million by their reckoning.
__________________
2011 Honda Insight + HID, LEDs, tiny PV panel, extra brake pad return springs, neutral wheel alignment, 44/42 PSI (air), PHEV light (inop), tightened wheel nut.
lifetime FE over 0.2 Gigameter or 0.13 Megamile.


For confirmation go to people just like you.
For education go to people unlike yourself.

Last edited by RedDevil; 02-25-2019 at 07:34 AM..
 
The Following 2 Users Say Thank You to RedDevil For This Useful Post:
aerohead (02-27-2019), NeilBlanchard (02-25-2019)