View Single Post
Old 02-25-2019, 03:59 PM   #5126 (permalink)
sendler
Master EcoModder
 
sendler's Avatar
 
Join Date: May 2011
Location: Syracuse, NY USA
Posts: 2,935

Honda CBR250R FI Single - '11 Honda CBR250R
90 day: 105.14 mpg (US)

2001 Honda Insight stick - '01 Honda Insight manual
90 day: 60.68 mpg (US)

2009 Honda Fit auto - '09 Honda Fit Auto
90 day: 38.51 mpg (US)

PCX153 - '13 Honda PCX150
90 day: 104.48 mpg (US)

2015 Yamaha R3 - '15 Yamaha R3
90 day: 80.94 mpg (US)

Ninja650 - '19 Kawasaki Ninja 650
90 day: 72.57 mpg (US)
Thanks: 326
Thanked 1,315 Times in 968 Posts
I read everything you posted and there is some information (intentionally?) missing. The chart showing the wholesale pricing going down 20 minutes after the battery started to contribute 35 MW indicates to me that SA must have several small interconnected grids that bill to a small area independently and they are showing the price change for this small area. This is the only explanation as to how injecting such a small amount of power could have any effect at all. There is no way that a 35MW addition can have ANY meaningful influence on a 2 GW load. But, if the gas companies have quit gouging for their stabilization services during shortages because they don't want to leave the door open for more battery installations that may eventually reach a level that does add up to something substantial, then it has made a good accomplishment.

Last edited by sendler; 02-25-2019 at 04:18 PM..
 
The Following User Says Thank You to sendler For This Useful Post:
aerohead (02-27-2019)