Thread: Solar power
View Single Post
Old 03-30-2019, 02:06 PM   #4 (permalink)
oil pan 4
Corporate imperialist
 
oil pan 4's Avatar
 
Join Date: Jul 2011
Location: NewMexico (USA)
Posts: 11,185

Sub - '84 Chevy Diesel Suburban C10
SUV
90 day: 19.5 mpg (US)

camaro - '85 Chevy Camaro Z28

Riot - '03 Kia Rio POS
Team Hyundai
90 day: 30.21 mpg (US)

Bug - '01 VW Beetle GLSturbo
90 day: 26.43 mpg (US)

Sub2500 - '86 GMC Suburban C2500
90 day: 11.95 mpg (US)

Snow flake - '11 Nissan Leaf SL
SUV
90 day: 141.63 mpg (US)
Thanks: 270
Thanked 3,528 Times in 2,802 Posts
That guy in NH is assuming an average amount of CO2 per unit of cost. That maybe gives you an idea of how much plant food is produced when building a panel. I want an actual number in KwH. The energy that made the aluminum portion of the panel is likely the biggest energy hog but aluminum smelting is usually done with very cheap nearly carbon free electricity most of the time. The glass portions energy is usually made with very cheap natural gas.
So the unit cost per CO2 only works with maybe like an entire industrial sector, not individual products.

I already figured out how much energy it takes to make glass and aluminum.
It's pretty easy to figure out precisely how much glass they use per panel. The Aluminum is more of a smash and weigh it kind of thing. Just need to know how much they use with out smashing one of my panels.

The exact unit cost is a trade secret in some manufacturing industries. One is tires, only the top 5 or 10 people in the company know exactly what it costs to make the tires.

For the cost of a panel I could buy around 1 mega watt hours of propane or like 6 mega watt hours of bagged high grade anthracite coal.
Problem is I don't have an efficient way to turn coal or propane into electricity.

My main motivations for solar panels are to actually be able to own some of my own power generation and profit.
Like all these people who bought into solar and are looking at like 9 to 20 year pay backs, haha suckers.
I'm looking at like a 2.5 to 4 year pay back. Used panels from AZ, constructing my own racking system, laying conduit, doing every bit of wiring that I'm allowed to do my self.
I would like to keep installing solar until it's no longer profitable.
I'm thinking that means up to a 12kw single phase 240v system.
Beyond that I would have to get my 3 phase 480v transformer hooked back up. Then I would be good for like another 50kw.
__________________
1984 chevy suburban, custom made 6.5L diesel turbocharged with a Garrett T76 and Holset HE351VE, 22:1 compression 13psi of intercooled boost.
1989 firebird mostly stock. Aside from the 6-speed manual trans, corvette gen 5 front brakes, 1LE drive shaft, 4th Gen disc brake fbody rear end.
2011 leaf SL, white, portable 240v CHAdeMO, trailer hitch, new batt as of 2014.

Last edited by oil pan 4; 03-30-2019 at 02:38 PM..
  Reply With Quote
The Following User Says Thank You to oil pan 4 For This Useful Post:
aerohead (03-30-2019)