The local electric coop limits residential peak grid feed back to about 12kw. I can install more than 12kw of panels if some face east and west but I would rather not.
To install more capacity I would have to go with a 480v setup. No one has done this on the coop so there is no president. So I have no idea how much it would cost. If they hook the transformers back up and don't charge any money good, because I already have a 480v 3 phase transformers on a pole and wires ran to a pump house at aren't being used.
But when I drop down to getting paid generation rate the pay back goes out to at least 10 years. I would probably have to put them on single axis trackers.
I sent my single axis tracker design to my mechanical engineer and he says it looks good, too over built in his opinion. But the trackers are designed to survive a tornado. The panels will be shredded, just add new panels.
__________________
1984 chevy suburban, custom made 6.5L diesel turbocharged with a Garrett T76 and Holset HE351VE, 22:1 compression 13psi of intercooled boost.
1989 firebird mostly stock. Aside from the 6-speed manual trans, corvette gen 5 front brakes, 1LE drive shaft, 4th Gen disc brake fbody rear end.
2011 leaf SL, white, portable 240v CHAdeMO, trailer hitch, new batt as of 2014.
|