Quote:
Originally Posted by redpoint5
Let's replace with wind turbines that effectively have emergency shutdowns several times daily.
I wonder if employees at Pilgrim are giving 100% effort/attention despite knowing their job is being eliminated.
|
Yeah looks like they are replacing base load normally taken care of by coal and nuclear with intermittent generation sources.
__________________
1984 chevy suburban, custom made 6.5L diesel turbocharged with a Garrett T76 and Holset HE351VE, 22:1 compression 13psi of intercooled boost.
1989 firebird mostly stock. Aside from the 6-speed manual trans, corvette gen 5 front brakes, 1LE drive shaft, 4th Gen disc brake fbody rear end.
2011 leaf SL, white, portable 240v CHAdeMO, trailer hitch, new batt as of 2014.
|