60kw bidirectional isn't squat in grid scale.
Then you get more than a few of them the buildings electrical service is maxed out.
Get about 10 or more and the local grid is maxed out.
But if all they do is build a vehicle to grid protocol then that is a step.
__________________
1984 chevy suburban, custom made 6.5L diesel turbocharged with a Garrett T76 and Holset HE351VE, 22:1 compression 13psi of intercooled boost.
1989 firebird mostly stock. Aside from the 6-speed manual trans, corvette gen 5 front brakes, 1LE drive shaft, 4th Gen disc brake fbody rear end.
2011 leaf SL, white, portable 240v CHAdeMO, trailer hitch, new batt as of 2014.
|