View Single Post
Old 02-13-2020, 04:31 PM   #5 (permalink)
redpoint5
Human Environmentalist
 
redpoint5's Avatar
 
Join Date: Aug 2010
Location: Oregon
Posts: 12,771

Acura TSX - '06 Acura TSX
90 day: 24.19 mpg (US)

Lafawnda - CBR600 - '01 Honda CBR600 F4i
90 day: 47.32 mpg (US)

Big Yeller - Dodge/Cummins - '98 Dodge Ram 2500 base
90 day: 21.82 mpg (US)

Chevy ZR-2 - '03 Chevrolet S10 ZR2
90 day: 17.14 mpg (US)

Model Y - '24 Tesla Y LR AWD

Pacifica Hybrid - '21 Chrysler Pacifica Hybrid
90 day: 57.45 mpg (US)
Thanks: 4,320
Thanked 4,474 Times in 3,439 Posts
Well, first bid is complete. They quoted a much larger system than I had originally expected. 10.4 kW 30 panel system (Hanwha duo g5 325 Mono). I asked why not poly, and he said the cost savings aren't there and hardly anyone makes them. AP System YC600 dual microinverter x15.

$31,558 gross cost parts and labor = $3.03 per installed watt.

1. Pretty much needs to be ground mount because permitting on a manufactured home is a 60/40 gamble. That adds $0.30 - $0.40 per kWh, or about 12%.

2. Oregon law precludes series inverters if solar is installed on a habitable structure. That means this contractor has only been installing micros and optimizers, so the quoted cost was for one of those even though a series inverter is acceptable on a ground mount. I didn't follow his logic on that...

3. Array would be approximately 50 feet by 10 feet and a line trenched about 150ft to the house.

Should qualify for $14,000 in upfront incentives or a total bill of $17,558. = $1.69 net cost. Federal tax credit of 26% should bring that down to $12,993, or $1.25 net cost.
__________________
Gas and Electric Vehicle Cost of Ownership Calculator







Give me absolute safety, or give me death!
  Reply With Quote
The Following User Says Thank You to redpoint5 For This Useful Post:
Xist (02-17-2020)