View Single Post
Old 04-01-2020, 07:43 PM   #731 (permalink)
Bill the Engineer
Master EcoModder
 
Bill the Engineer's Avatar
 
Join Date: Dec 2013
Location: Lower Slower Delaware
Posts: 461
Thanks: 430
Thanked 866 Times in 348 Posts
Quote:
Originally Posted by Bill the Engineer View Post
All is well. House is about 2-1/2 months from being done. Here is a view looking out from the Firebrid's future garage.
I'm estimating about another month to go if the builders stay healthy. Insulation is in and they have started hanging the wallboard this week. Maybe the stay home order will be lifted by the time the house is ready.


Attached Thumbnails
Click image for larger version

Name:	20200329_123153.jpg
Views:	606
Size:	65.6 KB
ID:	27816  
  Reply With Quote
The Following 2 Users Say Thank You to Bill the Engineer For This Useful Post:
aerohead (06-19-2020), me and my metro (04-02-2020)