View Single Post
Old 04-03-2021, 11:21 AM   #83 (permalink)
Piotrsko
Somewhat crazed
 
Piotrsko's Avatar
 
Join Date: Sep 2013
Location: 1826 miles WSW of Normal
Posts: 4,360
Thanks: 526
Thanked 1,188 Times in 1,048 Posts
Just so you know: there are by my count 26 square point shovel loads to the wheelbarrow load, of which it takes 4 1/2 trips to make a yard which will cover about 100 square feet about 3" deep deending on size. Pea gravel spreads less than 3/8" which spreads less than 1/2". Hopefully the delivery charge is a flat fee because you probably need at least 3 yards
  Reply With Quote