Quote:
Real time detection and container stoppage would be the issue.
|
It's a start. Then, what do you do about it? The Chunnel has a third tube.
When trains derail they have someplace to go. Just spackling over an offset in the tunnels won't cut it.
The powerline interconnect might be the best, only one tunnel needed.