I bought two 12-ounce cans of Great Stuff thinking that it would totally be enough, and since it seems like I never finish a 16-ounce can before I need to wait for everything to dry.
I finally remembered to put down a tarp and a drop cloth, so, since I broke the foam off of several rocks, there should be fewer insulated rocks than yesterday!
However, I used up both cans, still have big gaps that I feel the need to fill, and need to put at least a second bead on the last boards, so two more cans?
Then I can finally jack up the shed, level the gravel, carefully lower the shed, and never move it again!
Then drywall!
