I installed the fourth board by 1320!

I totally have time to install another board today, right?

Right?!

The thing is, that will be the last board on the bottom, except for whatever I do with the front wall, but there is only about a foot on each side of the door.

You are supposed to start with the ceiling, but I knew the bottom would be a pain.

You are supposed to use a drywall lift for the ceiling, but I have installed 4 boards in 4 days. With the 3 angles in the ceiling, I need to install 6 boards, and it will be even more difficult, so would one week ($188) be adequate?

Harbor Freight sells one for $260.

I cannot find any coupons.