View Single Post
Old 06-29-2022, 01:25 AM   #161 (permalink)
Xist
Not Doug
 
Xist's Avatar
 
Join Date: Jun 2012
Location: Show Low, AZ
Posts: 12,230

Chorizo - '00 Honda Civic HX, baby! :D
90 day: 35.35 mpg (US)

Mid-Life Crisis Fighter - '99 Honda Accord LX
90 day: 34.2 mpg (US)

Gramps - '04 Toyota Camry LE
90 day: 35.39 mpg (US)

Don't hit me bro - '05 Toyota Camry LE
90 day: 30.49 mpg (US)
Thanks: 7,254
Thanked 2,229 Times in 1,719 Posts
I only had 4 whole 1x2s. It seemed weird to not cut them to end in the middle of the rafters.

Not just weird, it was wrong.

It was never clear how wide each section of the ceiling was. I put one board in each corner and one in the middle.

Then I cut the fourth piece to finish the first row, but I need to trim the full piece, and hopefully use the partials eventually.

I need to cut 9 more 1x2s.

I tried screwing a scrap to the ends, but my headlamp died before I could make it work, which was just as well, because it was the wrong way.

__________________
"Oh if you use math, reason, and logic you will be hated."--OilPan4
  Reply With Quote