Quote:
Originally Posted by Piotrsko
Not a far step to add a function for 110//220 vac 40/60 cycle operation at whatever amp you desire from your inverter/controller. Perhaps a hundred lines of code and a 400v battery.
|
Exactly!
The 100 lines of code is where I start losing the plot tho.
Last I did any programming was in Basic.
I think the most complex thing I wrote was to work out the dimensions of 2-stroke expansion pipes.