My 2009 Ecomodding resolution/wish list:
1) Install a permanent upper and lower grill block with controlled radiator vents - Will be starting on the upper grill block in two weeks. Lower will be a prob to determine proper angle and dimensions to achieve best results.
2) Install bolt on CAI that is sitting in my garage - Done and sprayed injector cleaner to fix the throttle sticking closed.
3) Install full body undertray out of aluminum.
4) Deflect air flow away from windshield wipers.
5) Design and build kamback from roof to back edge of trunk that matches proper teardrop slope.
6) Rear wheel skirts.
7) Front dome hubcaps - Will be buying soon since I had a stock one fall off.
All of this is in an attempt to reach 45 mpg normal and 35 mpg with kayaks before June 14 when East Race Whitewater park opens. After installing the CAI, I had a tank at 34 mpg but only had the kayaks on for 1/3rd of the mileage. Tomorrow will be a two tank kayak trip to Kentucky and this year's base mileage for kayak trips.
|