Go Back   EcoModder Forum > EcoModding > Fossil Fuel Free
Register Now
 Register Now
 

Reply  Post New Thread
 
Submit Tools LinkBack Thread Tools
Old 07-10-2013, 02:01 PM   #1 (permalink)
PSmodder lurker
 
Join Date: Jan 2009
Location: Chino
Posts: 1,605
Thanks: 26
Thanked 908 Times in 522 Posts
ABB/Fastned will blaze the EV-trail

ABB/Fastned will build the world's largest nationwide network for fast-charging EV stations in the Netherlands. They will install 200 stations 50 kilometers within each station, along the Dutch highway system. They will be equipped with multi-standards fast chargers to get different/all major brands EV vehicles ready in 15-30 minutes. Cloud connectivity also coordinate your vehicle's charging schedules and locations along its charging system.



Homepage

  Reply With Quote
Alt Today
Popular topics

Other popular topics in this forum...

   
Reply  Post New Thread






Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.5.2
All content copyright EcoModder.com