Add a new electrical service panel (or disconnect box) before the existing service panel. (Remove the jumper from neutral to ground in the existing panel.) Wire a contactor between the new and old panels, with the coil and normally open contacts connected to the power from the new panel. Wire the common contacts to the old panel and the normally closed contacts to the inverter. The charger connects to the new panel before the relay.
__________________
If America manages to eliminate obesity, we would save as much fuel as if every American were to stop driving for three days every year. To be slender like Tiffany Yep is to be a real hypermiler...
Allie Moore and I have a combined carbon footprint much smaller than that of one average American...
|